client: Magnezit Holding

location: Satka, Ural, Russia

status: realised

2013-2014

 

The task was to upgrade the existing gate house and main security check point of the industrial complex of Magnezit. The industrial complex is hosting a variety of industrial and administrative buildings of the Magnezit holding. The current check point was a simple box with no corporative identity.

The existing conditions had also a huge lack of comfort for security staff who needs to check all in- and outgoing traffic even during weather conditions of -20 / -30 degrees celsius.